Plant 2 · SMT · sample data
Last 7 days, selected line and shift. Hairline = 85% target.
Minutes lost in the selected range, grouped by the OEE factor they hit.
Events in the selected range, longest first.
| Day | Shift | Station | Code | Reason | Min |
|---|
Same range, split by shift. Bar = OEE.
| Shift | OEE | A | P | Q | Boards |
|---|
OEE = Availability × Performance × Quality. Availability = run time ÷ planned time (480 min shift less 30 min breaks). Performance = (ideal cycle × boards) ÷ run time. Quality = good boards ÷ all boards. Data is synthetic and regenerates the same way every time the page loads, so numbers are stable for the demo. Ideal cycle: SMT-1 42 s, SMT-2 48 s, SMT-3 45 s per panel.